Step | | Procedure & Parts & Tools |
1 |
|
TURN OFF TANK
|
2 |
|
DISCONNECT FUEL LINE
|
3 |
|
OPEN TANK STRAP
|
4 |
|
REMOVE TANK
|
5 |
|
REMOVE 4 SCREWS FROM SWITCH BOX
Screwdriver-flat tip |
|
|
6 |
|
REMOVE SWITCH BOX FROM HANDLE
|
7 |
|
REMOVE SWITCH BOX COVER
|
8 |
|
PULL TO REMOVE THE 2 BLUE CONNECTORS
|
9 |
|
INSERT A PROBE IN THE SWITCH WHERE THE BLUE CONNECTORS WERE. INSERT BOTH PROBES INTO THE SWITCH AT THE SAME TIME. THE VOLT METER SHOULD BE DIALED TO THE CONTINUITY SETTING.
|
10 |
|
REVERSE STEPS 1 THRU 8 TO REASSEMBLE MACHINE
Volt meter (True RMS capable) |
|
Screwdriver-flat tip |
|
|